Taman Tekno BSD
Sektor XI, Blok L1 No. 15
Tangerang Selatan 15314
Thanks to a Kanban procedure, the customer receives the ready-to-install energy chain systems just-in-time at the installation location, as a result of which installation times are reduced and parts do not have to be stored.
An automotive supplier from Austria relies on igus smart plastics for these assembly lines in order to increase dependability and implement predictive maintenance.
Senin sampai Jumat dari jam 8.30 - 17.30 WIB
Senin sampai Jumat dari jam 8.30 - 17.30 WIB